The image in more detail
The following is an overview of the images contained in the press set
The Tseung Kwan O – Lam Tin Tunnel is an approximately 3.8 km long dual two-lane highway, connecting Tseung Kwan O and East Kowloon. The project includes the construction of a 2.2 km long tunnel with portal facilities and ventilation buildings.
TRIO and VARIO are used for the construction of a 14m high tunnel lining at the Tseung Kwan O portal. The modular systems are highly suitable for infrastructure projects like this one, meeting the requirements for flexible pour heights, intricate block-outs and no-tie concrete pours throughout the project. This flexibility enables efficient construction and reduces labor costs.
Our DUO formwork system will also be featured for the upcoming construction of the East Ventilation Building on this project. Stay tuned!