TRIO is a universal formwork system which places the highest emphasis on uncomplicated forming operations and the reduction of shuttering times.

TRIO Panel Formwork

The proven, universal panel formwork that performs year after year

The ethos of TRIO Wall Formwork is ensuring simple shuttering procedures and reduced shuttering times.  It is a proven system that has been used on many thousands of construction projects the world over.

Standard panels have only 6 different widths which allow easy handling and efficient transport. The BFD Coupler can be used for fast and easy connections making erection and dismantling times even faster.  

From residential construction and multi-storey structures to applications in infrastructure projects, TRIO ensures a high degree of utilisation and therefore cost-effectiveness. The closed panel profiles of TRIO provide high torsional stability whilst the excellent product quality guarantees a long service life. For all applications, TRIO fulfils the highest requirements.


Extended programme

TRIO Aluminium lightweight formwork for crane-independent working; easily distinguishable by its yellow powder coating

TRIO Structure panels with a free choice of formlining for special concrete surface requirements – supplied already pre-assembled

TRIO shaft element for complete internal shaft formwork, can be moved quickly with an all-round striking clearance of 30mm

MXK Bracket System serves as a working platform on MAXIMO and TRIO. The modular design and lightweight, manually-assembled system components ensure fast installation and a high level of cost effectiveness


TRIO Panel Formwork in action

  • The climbing shoe can be attached to the walls as well as slab edges.
    Save time by speeding up operations

    With a choice of panel widths that can suit any application, used both horizontally and vertically, alongside the BFD coupler.

     

    Project: Charlotte Street, London

  • Large-area shuttering with standard panels up to 3.30 m x 2.40 m - providing a high level of surface evenness and only 2 tie positions.
    Large and economical concreting

    With standard panels up to 3.3m x 2.4m - providing a high level of surface evenness and only 2 tie positions.

     

    Project: Oval Village

  • Easy and simple connections with the BFD Alignment Coupler as the only component for all panel connections.
    Easy and simple connections

    With the BFD Alignment Coupler as the only component for all panel connections.

     

    Project: Cardiff University, Innovation Campus