You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

CB Climbing Formwork

Overview

CB Climbing Formwork is normally used for supporting large-sized, anchored wall formwork. The climbing unit consists of formwork, working platform, brackets with formwork carriage and strongbacks as well as fi nishing platform. It can be moved very quickly by crane.

Large scaffold units

with simultaneous high load assumptions through the high loading capacity of the brackets

Time-saving moving procedure

of the securely assembled units consisting of platform and formwork in only one crane lift

Free of tripping hazards

in front of and behind the formwork as the platform lining is placed over the brackets (valid for CB 240)


Technical Details

  • Shoring for supporting anchored wall formwork; alternatively, purely as working scaffold
  • Type static for formwork heights up to 5.40 m
  • Finishing platform with ladder provides access to the wall
  • Optional equipment with wind bracing which prevents tipping inwards

Variations

CB 240 Climbing Formwork (carriage)

Bracket width 2.40 m with carriage (75 cm retraction distance), strongback and adjustable brace

Interested in our systems?

Our engineers will provide the most suitable solutions for your project.

Consult with us now for free.