You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Beitou Curved Retaining Wall

Project data

Location: Beitou, Taiwan

The project is a private construction on hillsides in Beitou which required special attention to water and soil conservation. It involves the construction of a curved retaining wall, PERI provided the DUO system template for this project.

Requirements

  • A curved retaining wall
  • Water and soil conservation on-site

Customer

Fengyu Group

PERI solution

  • DUO system formwork is lightweight and required no cranes to operate, hence it can maintain a perfect site condition
  • Our engineers comprised a solution for the curved structure with only DUO due to the high flexibility

PERI systems in use