Hong Kong International Airport Terminal 2 Expansion

Project data

Location: Hong Kong, Hong Kong

As part of the Three-Runway System (3RS) project, the existing Terminal 2 (T2) at Hong Kong International Airport (HKIA) will be expanded to provide full-fledged terminal services, serving departure, arrival, and transfer operations.

Requirements

  • A reliable falsework system to ensure a safe working environment
  • Formwork to construct the curved bridge deck

Customer

Well Park Construction Limited

Customer's benefit

  • Ensured safety on site
  • Reduced labour costs due to simple assembling
  • Flexible formwork system that tailors project requirement on concrete shapes
  • Minimal tower components, easy to erect and dismantle

PERI solution

  • PS100 Shoring System is used for the T2 expansion bridge deck falsework
  • HDS has a single leg load of 1000 kN to carry falsework and concrete load
  • The VARIOKIT formwork is flexible and can fulfill different needs on shapes