PS100 shoring system was used to cope with the project requirements due to the compatibility and high load bearing

Tseung Kwan O - Lam Tin Tunnel Landscape Deck
Tseung Kwan O, Hong Kong

The Tseung Kwan O – Lam Tin Tunnel (TKOLTT) is approximately 4.2 km long, connecting Tseung Kwan O and East Kowloon. It is to construct an approximately 3.8 km dual two-lane highway and the facilities and associated buildings such as civil, structural, marine, electrical and mechanical, traffic control and surveillance system, landscaping, as well as environmental mitigation measures.

One of the largest parts of the project is its landscape deck.

 

 

Project participants
Customer: Builderprise (Hong Kong) Company Limited

The Project

Impressions from the project process

Project Information

Related Products

Want to know how PERI can support your project?

We will tailor the most optimal solution to meet your specific requirements.

PS100 shoring system was used to cope with the project requirements due to the compatibility and high load bearing
PS100 shoring system was used to cope with the project requirements due to the compatibility and high load bearing