Tuen Mun - Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section

Project data

Location: Hong Kong, Hong Kong

Tuen Mun – Chek Lap Kok Link (TMCLKL)’s 5km long sub-sea road tunnel is a core component connecting Northwest New Territories (NWNT) with the Hong Kong International Airport (HKIA). The project involves two major reclamation areas, Northern Landfall in Tuen Mun and Southern Landfall adjacent to HKIA.

PERI works closely with DBJV to construct various structures on the two landfalls. On the North, TRIO panel system is utilized for the ventilation shaft and ventilation building. On the South, various systems are in place to achieve constrcution efficiency and safety. Bespoke scaffold traveller, wall and slab formwork travellers are supplied to construct the 250m long cut and cover tunnel.

This mega project is scheduled for completion in 2020.

Requirements

  • Huge volume of formwork and scaffolding material within the shortest period of time
  • A sequenced delivery in accordance with site progress was required due to space limitation on site
  • Falsework system to support precast and insitu elements simultaneously

Customer

Dragages-Bouygues Joint Venture

Customer's benefit

  • High walls and columns of best architectural concrete quality
  • Cost-effective formwork solution due to the use of standard systems
  • Materials are cycled between areas to achieve cost-saving through close cooperation between PERI and the client
  • Reduced dependency on skilled labour requirement

PERI solution

  • TRIO for walls, MULTIFLEX for slabs and PERI UP as access and falsework
  • Detailed technical preparation, comprehensive formwork & falsework design together with continuous on-site consultation are offered