Langen Foundation, Germany

Project data

Location: Neuss-Hombroich, Germany

Construction period until opening: until 2004

Architect: Tadao Ando Architect & Associates, Osaka, Japan

Requirements

  • predetermined plywood pattern
  • predefined quantity, position and distance of tie points
  • all corners with sharp edges
  • joint formation on equal areas, close formlining joints
  • use of SVB concrete with 100 kN/m² concrete pressure

Customer

Florack GmbH, Bonn

Customer's benefit

  • outstanding concrete result
  • no visible joint off-set
Langen Foundation, Statement: Thomas Schieren, Foreman structural engineering
Thomas Schieren
Foreman structural engineering

As we of course expected, we were able to achieve an excellent concrete result with the PERI formwork solution. We have been working with PERI for 20 years now and it has always served us well.

PERI solution

  • VARIO GT 24 girder wall formwork with a special panel format screwed at the back
  • VARIO GT 24 girder wall formwork elements with 190 cm x 90 cm formwork panel and optically required six tie points per panel, partly as blind plug
  • utilisation of the fair-faced concrete coupling to reduce the joint off-set

PERI systems in use